Pilot Models and the R&D Tax Credit: When Does Experimental Property Qualify?
Pilot models can present some of the most complicated questions in an R&D tax credit study.
A taxpayer may build a fully functional machine, manufacturing system or other piece of equipment specifically to resolve technological uncertainty. The resulting property may look like a capital asset—and may ultimately be sold or used in the taxpayer’s business.
Does that prevent the costs from qualifying as research expenditures?
Not necessarily.
What Is a Pilot Model?
Treasury Regulation §1.174-2 defines a pilot model as a representation or model of a product produced to evaluate and resolve uncertainty concerning the product during its development or improvement.
Importantly, a pilot model can be fully functional.
The regulations provide examples involving custom machinery, experimental aircraft and individual components incorporated into existing products. They also make clear that the ultimate success, failure, sale or use of the resulting pilot model does not, by itself, determine whether the underlying development costs constitute research expenditures.
The more important question is why the property was produced and what activities were performed to resolve the uncertainty.
Section 174 and Section 41 Are Not the Same Analysis
This distinction becomes particularly important when determining which pilot-model expenditures constitute Qualified Research Expenses (QREs) for purposes of the Section 41 credit.
Section 41 permits taxpayers to include certain wages, supplies and contract research expenditures associated with qualified research.
For supplies, however, Section 41 generally excludes land, improvements to land and property of a character subject to depreciation.
As a result, determining that a taxpayer developed a pilot model does not automatically establish that the entire cost of that pilot model is a QRE.
The analysis needs to go deeper.
Consider a Prototype Tractor
Assume a manufacturer develops an entirely new tractor design to resolve technological uncertainty regarding its performance and appropriate design.
The tractor incorporates numerous newly designed prototype components but uses an existing commercially available engine.
The development of the tractor may involve a qualifying process of experimentation. But that does not necessarily mean every component incorporated into the tractor automatically qualifies as a Section 41 supply.
The existing engine requires its own analysis, including whether it constitutes property of a character subject to depreciation and how it was used in the research.
Now change the facts.
Instead of installing the existing engine without modification, engineers use existing engine components together with newly developed prototype components. They test different configurations, evaluate interactions between the new and existing components, encounter failures, modify the design and continue testing to resolve uncertainty regarding the performance of the redesigned engine.
That creates a different technical analysis.
The focus shifts to what was actually being developed, which components were used in the experimentation, and how those costs relate to the qualified research activities.
Commercially Available Components Can Still Be Part of the Experimentation
The fact that a component already exists does not necessarily mean the activities involving it cannot be part of qualified research.
Many experimental systems combine new technology with commercially available components.
The relevant question is whether technological uncertainty exists regarding the development or integration of the overall system or component and whether the taxpayer evaluates alternatives through a process of experimentation.
For example, engineers may know that several commercially available components work independently but remain uncertain whether those components can be integrated with a newly developed component to achieve the required function, performance, reliability or quality.
Testing alternative configurations, interfaces, materials or designs to resolve that uncertainty may constitute part of the taxpayer’s process of experimentation.
However, taxpayers must still separately determine whether the cost of the property itself falls within one of the categories of QREs permitted by Section 41.
That distinction is critical.
An activity can be qualified research without every expenditure associated with that activity being a qualified research expense.
When Does the Pilot End?
Another important issue is identifying when the technological uncertainty was resolved.
Treasury regulations distinguish between costs incurred to develop and test a pilot model while uncertainty exists and subsequent production costs incurred after that uncertainty has been eliminated.
This means a taxpayer should be able to establish:
- What technological uncertainty existed at the beginning of development
- What alternatives were considered
- What testing and experimentation were performed
- Which components were developed or used during that experimentation
- When the uncertainty was resolved
- Which costs were incurred before and after that point
The ultimate use of the pilot model does not necessarily control the analysis.
A fully functional pilot model may subsequently be sold or placed into service. What matters is whether it was originally produced and used to evaluate and resolve uncertainty during development.
Why Pilot Models Require a Cost-by-Cost Analysis
One of the biggest risks in a pilot-model study is treating the entire project as either qualified or nonqualified.
The better analysis is generally more granular.
A project may contain engineering wages associated with qualified services, contract research, experimental materials and prototype components, commercially available equipment, depreciable property, production costs and other expenditures.
Those costs do not necessarily receive the same treatment simply because they relate to the same pilot model.
The taxpayer must first establish the qualified research activities and then determine which associated expenditures satisfy the separate requirements for QRE treatment under Section 41.
Documentation Becomes Critical
Pilot models can be particularly challenging under examination because the final product may look very different from what existed during development.
Several years later, an examiner may see a fully functioning piece of equipment operating in the taxpayer’s facility.
The taxpayer needs to be able to demonstrate what was occurring when the costs were incurred.
Engineering drawings, test results, design iterations, failure analyses, prototype records, technical interviews, purchase records and contemporaneous project documentation can help establish the uncertainties encountered, experimentation performed and relationship between specific expenditures and the qualified research.
The Key Question Is Not Whether You Built Pilot Models
Calling something a “pilot,” “prototype” or “experimental system” does not determine its treatment under Section 41.
The analysis requires understanding the engineering.
What was uncertain?
What was being developed or improved?
Which alternatives were evaluated?
Which components were part of that experimentation?
When was the uncertainty resolved?
And which of the resulting expenditures actually satisfy the requirements to be treated as QREs?
Pilot-model projects often sit directly at the intersection of engineering and tax law. Properly evaluating them requires both disciplines.